| Philippines - 1985 - 414 páginas
...shall be green. 11 STORAGE The cement shall be stored in such a manner as to permit easy access foe proper inspection and identification of each shipment and in a suitable weathertight building that will protect the cement from dampness and minimize warehouse set. ANNEX A POZZOLAN FOB U&a IN... | |
| Gilbert Richard Redgrave - 1905 - 430 páginas
...floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor, and a period of at least twelve days allowed... | |
| Edwin Clarence Eckel - 1905 - 796 páginas
...floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| Charles Evan Fowler - 1905 - 370 páginas
...floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at cast twelve days allowed for... | |
| Columbus, O. Dept. of public service - 1905 - 162 páginas
...weather-tight building having a wooden floor properly blocked or raised from the ground, and in such manner as to permit easy access for proper inspection and identification of each shipment. The Engineer shall be notified at once of each delivery of cement. Every facility shall be provided... | |
| W. Purves Taylor - 1905 - 344 páginas
...floor properly blocked or raised from the ground. 4. — The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. — Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| Charles Carroll Brown - 1905 - 384 páginas
...floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| William Albert Noyes - 1905 - 808 páginas
...floor properly blocked or raised from the ground. (4) The cement shall be stored in such a manner as to permit easy access for proper inspection 'and identification of each shipment. (5) Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| Rolla C. Carpenter - 1906 - 908 páginas
...floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| Hiram Bertrand Andrews - 1908 - 68 páginas
...floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor, and a period of at least twelve days allowed... | |
| |