Handbook of Building Construction: Data for Architects, Designing and Constructing Engineers, and Contractors ...

Capa
George A. Hool, Nathan C. Johnson
McGraw-Hill Book Company, Incorporated, 1920 - 1474 páginas
0 Críticas
As críticas não são validadas, mas a Google verifica a existência de conteúdo falso e remove-o quando é identificado

No interior do livro

Opinião das pessoas - Escrever uma crítica

Não foram encontradas quaisquer críticas nos locais habituais.

Índice

pounds
1036
31
1037
33
1039
39
1040
40
1041
150
1042
285
1081
320
1082
416
1101
500
1102
750
1105
26
1184
42
1185
47
1187
19
1188
26
1189
27
1190
27
1192
36
1195
33
1196
Direitos de autor

Outras edições - Ver tudo

Palavras e frases frequentes

Passagens conhecidas

Página 1392 - Portland cement is the product obtained by finely pulverizing clinker produced by calcining to incipient fusion an intimate and properly proportioned mixture of argillaceous and calcareous materials, with no additions subsequent to calcination excepting water and calcined or uncalcined gypsum.
Página 1400 - If the percentage of elongation of any tension test specimen is less than that specified in Sec. 8(a) and any part of the fracture is outside the middle third of the gage length, as indicated by scribe scratches marked on the specimen before testing, a retest shall be allowed.
Página 1392 - The cement shall be stored in such a manner as to permit easy access for proper inspection and identification of each shipment, and in a suitable weather-tight building which will protect the cement from dampness.
Página 1400 - The inspector representing the purchaser shall have free entry, at all times while work on the contract of the purchaser is being performed, to all parts of the manufacturer's works which concern the manufacture of the material ordered.
Página 1244 - place of employment," shall mean and include every place, whether indoors or out, or underground, and the premises appurtenant thereto where either temporarily or permanently any industry, trade or business, is carried on, or where any process or operation, directly or indirectly related to any industry, trade or business, is carried on, and where any person is directly or indirectly employed by another for direct or indirect gain or profit but shall not include any place where persons are employed...
Página 891 - In cases where timbers do not contain the pith and it is impossible to locate it with any degree of accuracy, the same inspection shall be made over 3...
Página 890 - ... and is so fixed by growth or position that it will retain its place in the piece.
Página 1394 - If any test specimen shows defective machining or develops flaws, it may be discarded and another specimen substituted. (c) If the percentage of elongation of any tension test specimen is less than that specified in Section 5 (a) and any part of the fracture is more than % in.
Página 1395 - Section 4, which represent rejected material, shall be preserved for two weeks from the date of the test report. In case of dissatisfaction with the results of the tests, the manufacturer may make claim for a rehearing within that time.
Página 1064 - Work, and will endeavor to guard the Owner against defects and deficiencies in the Work of the Contractor.

Informação bibliográfica