Annual Report of the Secretary of War, Volume 2U.S. Government Printing Office, 1887 |
No interior do livro
Resultados 1-3 de 75
Página 2704
... taken on the same manner as previously . The reason for the above change will be given hereafter . The accompanying tables of soundings include all , except the first set taken on the three sections , which are not regarded as ...
... taken on the same manner as previously . The reason for the above change will be given hereafter . The accompanying tables of soundings include all , except the first set taken on the three sections , which are not regarded as ...
Página 2842
... taken from the observer's notes and correspond to the mean time of the measurements for area . The readings given for other days are the means of the readings taken on each day when more than one were taken . The gauge was not read at ...
... taken from the observer's notes and correspond to the mean time of the measurements for area . The readings given for other days are the means of the readings taken on each day when more than one were taken . The gauge was not read at ...
Página 3082
... taken on the upper , middle , and lower section after each float , and a discharge section made up as the mean of the three sections so determined . In this case , as the observed data was generally insufficient to determine accurately ...
... taken on the upper , middle , and lower section after each float , and a discharge section made up as the mean of the three sections so determined . In this case , as the observed data was generally insufficient to determine accurately ...
Índice
IN CHARGE OF MAJ G J LYDECKER CORPS OF ENGINEERS | 2527 |
Alphabetical Index will be found at the end of each Part | 2529 |
IN CHARGE OF COL WILLIAM P CRAIGHILL CORPS OF ENGINEERS | 2537 |
38 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
amount appropriation approved August avenue bank barges bench-mark Benton Board of Engineers boats chain fence channel Chief of Engineers Cincinnati completed Congress construction Corps of Engineers cost cubic yards datum areas depth dike district east estimate expended Fort Benton freight gauge H street north harbor high bridge high water highly improved inches Inclosed with post indorsement intersection Island July June 30 land lawn surfaces levees low bridge low water measurement meter miles Mississippi River Commission Missouri River Missouri River Commission navigation obedient servant Ohio River park partially improved piers planted post and chain proposed Red River repairs reservoir respectfully revetment rock Saint Joseph Saint Louis Secretary Secretary of War Shreveport span square feet Stack Island station steamer street north streets west submitted sugar-house chimney survey tape tion Total Trapezoid area Triangle area tunnel unimproved Washington WASHINGTON AQUEDUCT width Willamette River