Annual Report of the Secretary of War, Volume 2,Parte 4U.S. Government Printing Office, 1889 |
No interior do livro
Resultados 1-3 de 73
Página 2707
... bank . On the remaining dikes the deposit was slight . The repairs undertaken were with the view of preventing any further caving be- tween these dikes where it had occurred , and consisted of three mattresses sunk along the bank ...
... bank . On the remaining dikes the deposit was slight . The repairs undertaken were with the view of preventing any further caving be- tween these dikes where it had occurred , and consisted of three mattresses sunk along the bank ...
Página 2770
... bank . 91.92 P.B. M. B. M. 341 ( 127 ) P. B. M. 9 . P. B. M. Point on left bank of river . P. B. M. 9 . Temporary B. M .. P. B.M. Point on left bank of river . P. B. M. P. B. M. P. B. M .. Temporary B. M .. B. M. 335 ( 132 ) Point on ...
... bank . 91.92 P.B. M. B. M. 341 ( 127 ) P. B. M. 9 . P. B. M. Point on left bank of river . P. B. M. 9 . Temporary B. M .. P. B.M. Point on left bank of river . P. B. M. P. B. M. P. B. M .. Temporary B. M .. B. M. 335 ( 132 ) Point on ...
Página 2792
... bank could not be undertaken until October 22 , when a few boats had been made temporarily serviceable by slight repairs . The bank was revetted from " P " to " R , " a distance of about 800 feet . Work was suspended on October 24 ...
... bank could not be undertaken until October 22 , when a few boats had been made temporarily serviceable by slight repairs . The bank was revetted from " P " to " R , " a distance of about 800 feet . Work was suspended on October 24 ...
Índice
IN CHARGE OF MAJ W R LIVERMORE CORPS OF ENGINEERS | 2209 |
Alphabetical index will be found at the end of each part | 2211 |
IMPROVEMENTS Patuxent River Md 998 channel at Mount Vernon Va 999 | 2251 |
62 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
16 feet Abstract of proposals act of August address of bidder advertisement dated Amount appropriated amount expended appropriated by act August 11 balance available bank barges breakwater bridge built canal cents per cubic cents per hour channel Chief of Engineers City Clair Flats commerce completed construction contract Corps of Engineers cost cribs cubic yards depth Detroit dikes dredging East Saginaw ending June 30 ENGINEER OFFICE excavation expended during fiscal feet long feet wide fiscal year ending harbor act improvement inches jetty labor Lake levees liabilities outstanding July linear feet low water Mary's Falls Canal material Michigan miles Mississippi River Commission Missouri River Money statement mouth navigation Ohio pier piles Point port pounds profitably expended repairs revetment Riprap river and harbor rock Saginaw River Sault Ste scow scow measure season sections shore stone superstructure survey timber tons Total vessels width