" The value of any such extra work or change shall be determined in one or more of the following ways: (a) By estimate and acceptance in a lump sum. (b) By unit prices named in the contract or subsequently agreed upon. (c) By cost and percentage or by cost... "
Acquiring a Home - Página 270
por Clinton H. Blake (Jr) - 1925 - 280 páginas
Visualização integral - Acerca deste livro

The Law of Architecture and Building: A Consideration of the Mutual Rights ...

Clinton Hamlin Blake - 1916 - 360 páginas
...ordered. The value of any such change shall be determined in one or more of the following ways: (a) By Estimate and Acceptance in a lump sum. (b) By Unit...upon, the Contractor, provided he receive an order in writing signed by the Owner and countersigned by the Architect, shall proceed with the work, no...
Visualização integral - Acerca deste livro

Business Law for Engineers

Calvin Frank Allen - 1917 - 468 páginas
...ordered. The value of any such change shall be determined in one or more of the following ways: (a) By Estimate and Acceptance in a lump sum. (b) By Unit...upon, the Contractor, provided he receive an order in writing signed by the Owner and countersigned by the Architect, shall proceed with the work, no...
Visualização integral - Acerca deste livro

Business Law for Engineers

Calvin Frank Allen - 1917 - 472 páginas
...ordered. The value of any such change shall be determined in one or more of the following ways: (a) By Estimate and Acceptance in a lump sum. (b) By Unit...upon, the Contractor, provided he receive an order in writing signed by the Owner and countersigned by the Architect, shall proceed with the work, no...
Visualização integral - Acerca deste livro

Cyclopedia of Architecture, Carpentry, and Building: A General ..., Volume 6

1917 - 550 páginas
...ordered. The value of any such change shall be determined in one or more of the following ways : (a) By Estimate and Acceptance in a lump sum. (b) By Unit...Percentage or by Cost and a fixed fee. (d) If none of tht> above methods is agreed upon, the Contractor, provided he receive an order in writing signed by...
Visualização integral - Acerca deste livro

Carpentry and Contracting: A Practical Reference Work on Carpentry ..., Volume 5

1919 - 476 páginas
...ordered. The value of any such change shall be determined in one or more of the following ways : (a) By Estimate and Acceptance in a lump sum. (b) By Unit...upon, the Contractor, provided he receive an order in writing signed by the Owner and countersigned by the Architect, shall proceed with the work, no...
Visualização integral - Acerca deste livro

The Handbook of Architectural Practice

American Institute of Architects - 1920 - 208 páginas
...-V \ . V- -• •<-*• '• ••• -V •' • • :': \, ,x ^Vu'"'" '^- ".wyx ' • ' *1 i J (b) By unit prices named in the contract or subsequently...an order as above, shall proceed with the work, no appeal-to- arbitration being allowed from such . older t& proceed. Jt /Q.JMSC-^ t << > f. Oi^^ > &•...
Visualização integral - Acerca deste livro

The Engineering Manual of the American Electric Railway Engineering ...

American Electric Railway Engineering Association - 1922 - 1362 páginas
...the following ways : (a) By estimate and acceptance of a lump sum price. (b) By unit prices stated in the contract or subsequently agreed upon. (c) By cost and percentage or by cost and a fixed sum. the Contractor shall decline or fail to perform such work or furnish such extra material as authorized...
Visualização integral - Acerca deste livro

The Architect's Law Manual

Clinton H. Blake (Jr) - 1924 - 264 páginas
...ordered. The value of any such change shall be determined in one or more of the following ways: (a) By estimate and acceptance in a lump sum. (b) By unit...methods is agreed upon, the Contractor, provided he receives an order as above, shall proceed with the work, no appeal to arbitration being allowed from...
Visualização integral - Acerca deste livro

Management Engineering: The Design and Organization of Industrial Plants ...

Perley F. Walker - 1924 - 380 páginas
...value of any such extra work or change shall be determined in one or more of the following ways : a. By estimate and acceptance in a lump sum. b. By unit...d. If none of the above methods is agreed upon, the Constructor, provided he receive an order as above, shall proceed with the work, no appeal to arbitration...
Visualização integral - Acerca deste livro

Water Works Practice

American Water Works Association - 1925 - 824 páginas
...value of any such extra work or change shall be determined in one or more of the following ways: a. By estimate and acceptance in a lump sum. b. By unit...By cost and percentage or by cost and a fixed fee. If none of the above methods is agreed upon, the Contractor, provided he receives an order as above,...