Annual Report of the Secretary of War, Volume 2U.S. Government Printing Office, 1893 |
No interior do livro
Resultados 1-3 de 85
Página 1286
... feet , while the depth was originally from 2 to 17 feet . At a point called the Narrows , about 4.5 miles above the mouth , the stream suddenly expands into a wide bay , from 1,000 to 6,000 feet wide , forming a con- tinuous shoal , on ...
... feet , while the depth was originally from 2 to 17 feet . At a point called the Narrows , about 4.5 miles above the mouth , the stream suddenly expands into a wide bay , from 1,000 to 6,000 feet wide , forming a con- tinuous shoal , on ...
Página 1295
... feet wide and from 12 to 13 feet deep through these bars , so as to secure a permanent channel about 100 feet wide and 12 feet deep at low tide , at an estimated cost of $ 80,000 . Under this project a channel 120 feet wide and 12 feet ...
... feet wide and from 12 to 13 feet deep through these bars , so as to secure a permanent channel about 100 feet wide and 12 feet deep at low tide , at an estimated cost of $ 80,000 . Under this project a channel 120 feet wide and 12 feet ...
Página 1397
... feet to 12 feet in width , from 10 feet to 6 inches in depth at high water , and winding through a marine marsh ... wide and 3 feet deep at low water through the shoals between those points , at a cost estimated in 1887 at $ 50,000 ...
... feet to 12 feet in width , from 10 feet to 6 inches in depth at high water , and winding through a marine marsh ... wide and 3 feet deep at low water through the shoals between those points , at a cost estimated in 1887 at $ 50,000 ...
Índice
IN THE CHARge of Maj W H Heuer CORPS OF ENGINEERS | 1141 |
PART II | 1143 |
EXAMINATIONS Little Wabash River Ill 2569 Embarras River Ill 2573 | 1151 |
59 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
act approved July American Dredging Co Amount appropriated Amount estimated amount expended Apalachicola River appropriated by act approved July 13 Assistant Engineer August 11 balance unexpended banks bridge Cedar Keys cents channel Chief of Engineers civil act Cluster commerce COMMERCIAL STATISTICS completion of existing compliance with requirements contract Corps of Engineers Creek cubic yards dams Delaware depth dike ending June 30 ENGINEER OFFICE existing project expended during fiscal expended in fiscal feet at mean feet deep feet wide fiscal year ending Florida freight harbor acts high water Island jetty Jones River June 14 June 30 logs low-water lumber Mayport mean low water miles Money statement mouth navigation obstructions overhanging trees plan of improvement Point port profitably expended railroad removed requirements of sections respectfully riprap river and harbor rock scows September 19 shoals steamboat steamers stone Submitted in compliance sundry civil act survey Tons Total vessels width Wilmington