Annual Report of the Secretary of War, Volume 2U.S. Government Printing Office, 1893 |
No interior do livro
Resultados 1-3 de 88
Página 1194
... dredging between the Third Street Bridge and the Pulp Works , and for the removal of two ledges of rock , one above and one below Third Street Bridge , were opened November 11 , 1892. The lowest bidder was the Atlas Dredging Com- pany ...
... dredging between the Third Street Bridge and the Pulp Works , and for the removal of two ledges of rock , one above and one below Third Street Bridge , were opened November 11 , 1892. The lowest bidder was the Atlas Dredging Com- pany ...
Página 1282
... dredging a a part of the channel through Occoquan Bar , which was next in order as an obstruction to navigation . This channel was made 8 feet deep to provide for anticipated filling from freshets before the construction of the dike ...
... dredging a a part of the channel through Occoquan Bar , which was next in order as an obstruction to navigation . This channel was made 8 feet deep to provide for anticipated filling from freshets before the construction of the dike ...
Página 1395
... dredging of the cut through the Old Town Channel to North River , and by reducing to the width of 100 feet and depth of 5 feet the chan- nel to be dredged from the Bulkhead Channel to Beaufort ; in 1890 the project was again modified by ...
... dredging of the cut through the Old Town Channel to North River , and by reducing to the width of 100 feet and depth of 5 feet the chan- nel to be dredged from the Bulkhead Channel to Beaufort ; in 1890 the project was again modified by ...
Índice
IN THE CHARge of Maj W H Heuer CORPS OF ENGINEERS | 1141 |
PART II | 1143 |
EXAMINATIONS Little Wabash River Ill 2569 Embarras River Ill 2573 | 1151 |
59 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
act approved July American Dredging Co Amount appropriated Amount estimated amount expended Apalachicola River appropriated by act approved July 13 Assistant Engineer August 11 balance unexpended banks bridge Cedar Keys cents channel Chief of Engineers civil act Cluster commerce COMMERCIAL STATISTICS completion of existing compliance with requirements contract Corps of Engineers Creek cubic yards dams Delaware depth dike ending June 30 ENGINEER OFFICE existing project expended during fiscal expended in fiscal feet at mean feet deep feet wide fiscal year ending Florida freight harbor acts high water Island jetty Jones River June 14 June 30 logs low-water lumber Mayport mean low water miles Money statement mouth navigation obstructions overhanging trees plan of improvement Point port profitably expended railroad removed requirements of sections respectfully riprap river and harbor rock scows September 19 shoals steamboat steamers stone Submitted in compliance sundry civil act survey Tons Total vessels width Wilmington