A Practitioner's Guide to Construction LawALI-ABA, 2000 - 744 páginas |
No interior do livro
Página xviii
... Arbitration 6-34 §6.02(0(4) Termination, Suspension or Abandonment 6-35 §6.02(0(5) Hazardous Substances 6-36 §6.02(0(6) Miscellaneous Provisions 6-36 §6.03 The Architect's Perspective-Increasing Revenues and Reducing the Risk of ...
... Arbitration 6-34 §6.02(0(4) Termination, Suspension or Abandonment 6-35 §6.02(0(5) Hazardous Substances 6-36 §6.02(0(6) Miscellaneous Provisions 6-36 §6.03 The Architect's Perspective-Increasing Revenues and Reducing the Risk of ...
Página xxi
... Arbitration )([) Miscellaneous Provisions )(m)Termination of the Agreement )(n) Basis of Compensation )(o) Other Conditions and Services )(p) EnvironmentaJ Condition Appendix 1 Appendix 2 Appendix 3 AIAFormAlOl-1997 AIA Form A121/CMc ...
... Arbitration )([) Miscellaneous Provisions )(m)Termination of the Agreement )(n) Basis of Compensation )(o) Other Conditions and Services )(p) EnvironmentaJ Condition Appendix 1 Appendix 2 Appendix 3 AIAFormAlOl-1997 AIA Form A121/CMc ...
Página xxiii
... Arbitration §10.05(b)(3) Site Conditions § 10.05(b)(4) Consequential Damages §10.06 Subcontractors § 10.06(a) Selection of Subcontractors § 10.06(b) Flow Through § 10.06(c) Remedies §10.07 Construction by Owner or by Separate Contractor ...
... Arbitration §10.05(b)(3) Site Conditions § 10.05(b)(4) Consequential Damages §10.06 Subcontractors § 10.06(a) Selection of Subcontractors § 10.06(b) Flow Through § 10.06(c) Remedies §10.07 Construction by Owner or by Separate Contractor ...
Página xxx
... Arbitration 19-8 § 19.02(b)(1) Introduction 19-8 § 1 9.02(b)(2) Fast Track Rules 1 9-9 § 1 9.02(b)(3) Regular Track Rules 1 9-9 § 19.02(b) (4) Large, Complex Construction Case Rules 19-12 § 19.02(b) (5) Legal Issues Arising Out of ...
... Arbitration 19-8 § 19.02(b)(1) Introduction 19-8 § 1 9.02(b)(2) Fast Track Rules 1 9-9 § 1 9.02(b)(3) Regular Track Rules 1 9-9 § 19.02(b) (4) Large, Complex Construction Case Rules 19-12 § 19.02(b) (5) Legal Issues Arising Out of ...
Página 2-10
O conteúdo desta página está restrito.
O conteúdo desta página está restrito.
Índice
BUILDING CODES | 3-1 |
CONSTRUCTION INDUSTRY BONDS AND SURETIES | 4-1 |
AIA Form B 411997 643 | 4-7 |
PREPARING A DESIGN SERVICES AGREEMENT | 5-1 |
EVALUATING AIAB1411997 EDITION | 6-1 |
SELECTING THE CONTRACTOR AND THE STRUCTURE | 8-1 |
AIAFormAlOl1997 879 | 8-79 |
AIA Form A121CMc1991 887 | 8-87 |
AIA Form A2011997 1063 | 11-1 |
UNIQUE ASPECTS OF RESIDENTIAL CONSTRUCTION | 12-1 |
THE MILLER ACT AND LITTLE MILLER ACTS | 13-1 |
DAVISBACON PREVAILING WAGE RULES | 14-1 |
COMPETITIVE BIDDING | 15-1 |
MECHANICS LIENS | 16-1 |
OWNERCONTRACTOR DAMAGES | 18-1 |
ALTERNATIVE DISPUTE RESOLUTION | 19-1 |
Palavras e frases frequentes
acceptance accordance action additional agree agreement allow American amount applicable approval arbitration architect arising authority Benefit bidder bond building cause City claim clause Code compensation completed concluded considered Constr construction manager Contract Documents contractor Corp cost court coverage covered damages default defects delay described Design/Builder determine drawings duty edition engineer entitled equipment expenses failed failure final furnish held indemnification interest involved issue labor lender liability lien limited loan loss materials Miller Act negligence notice obligations owner paid Paragraph parties payment payment bond performance performance bond period permitted person plans prepared principal professional proposed reasonable recover responsibility result risk schedule specifications standard statute subcontractor Subparagraph substantial Supp supra note surety termination tion United unless written