| Nonprofit Housing Center - 1976 - 160 páginas
...to determine in general if the work is proceeding in accordance with the contract documents. He will not be required to make exhaustive or continuous on-site...inspections to check the quality or quantity of the work. Neither will he be responsible for the contractor's failure to carry out the construction work in accordance... | |
| James E. Rappoport, Robert F. Cushman, Karen Daroff - 1992 - 370 páginas
...Designer shall not be required to make exhaustive or continuous inspections at the Project premises to check the quality or quantity of the Work. On the basis of such on-site observations, the Designer shall keep the Owner informed of the progress and quality of the Work, and shall endeavor... | |
| C. Jaye Berger - 1994 - 244 páginas
...Designer shall not be required to make exhaustive or continuous inspections at the Project premises to check the quality or quantity of the Work. On the basis of such on-site observations, the Designer shall keep the Owner informed of the progress and quality of the Work, and shall endeavor... | |
| Sanford I. Heisler - 1994 - 524 páginas
...Certifícale for Payment shaD not be a representation that the Architect has { 1 ) made exbaus iiie or continuous onsite inspections to check the quality or quantity of the Work. |2) reviewed construction means, meth ods. techniques, sequences of procedures, (3) reviewed coptes... | |
| Richard A. Holderness, Walker, Stephen D. Butler, Stephen G. Walker - 1995 - 2064 páginas
...documents and general compliance with the applicable building codes. Such observation does not include exhaustive or continuous onsite inspections to check the quality or quantity of construction work. See Iowa Code § 544A.16(8). 17 Id. 18 Iowa Code § 544A.18. (3) Nonstructural alterations20... | |
| Marc M. Schneier - 1999 - 742 páginas
...guard the Owner against defects and deficiencies in the Work of the Contractor. The Architect will not be required to make exhaustive or continuous on-site...inspections to check the quality or quantity of the Work. The Architect will not be responsible for construction means, methods, techniques, sequences, or procedures,... | |
| John G. Cameron - 2000 - 780 páginas
...if the Work is being performed in a manner indicating that the Work, when fully completed, will be in accordance with the Contract Documents. However,...inspections to check the quality or quantity of the Work. The Architect shall neither have control over or charge of, nor be responsible for, the construction... | |
| Robert F. Cushman, John D. Carter, Douglas F. Coppi, Paul J. Gorman - 2001 - 868 páginas
...guard the Owner against defects and deficiencies in the work of the Contractor. The Architect will not be required to make exhaustive or continuous on-site...inspections to check the quality or quantity of the work. The Architect will not be responsible for the construction site, means, methods, techniques, sequences... | |
| |