Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 88
Página 185
and proposes to attain this by operating a hand - propelled snag - boat of light draught between low and middle ... a good beginning was made upon the project , nearly eight hundred dangerous snags ( low water ) having been removed .
and proposes to attain this by operating a hand - propelled snag - boat of light draught between low and middle ... a good beginning was made upon the project , nearly eight hundred dangerous snags ( low water ) having been removed .
Página 191
The proposed improvement is the removal of the shoals below Green- ville and the removal of snags and other obstructions to navigation by snag - boat at an estimated cost of $ 7,300 . The river and harbor act of August 11 ...
The proposed improvement is the removal of the shoals below Green- ville and the removal of snags and other obstructions to navigation by snag - boat at an estimated cost of $ 7,300 . The river and harbor act of August 11 ...
Página 295
On account of lack of funds the snag - boat only worked 29 days , removed 283 snags , built 2 wing - dams , blasted off a ... Before improvement the channel of the Upper Sacramento River was obstructed by snags , and navigation was very ...
On account of lack of funds the snag - boat only worked 29 days , removed 283 snags , built 2 wing - dams , blasted off a ... Before improvement the channel of the Upper Sacramento River was obstructed by snags , and navigation was very ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width