Annual Report of the Secretary of War, Volume 2,Parte 1U.S. Government Printing Office, 1888 |
No interior do livro
Resultados 1-3 de 71
Página 188
... shoals also impeded navigation . Up to June 30 , 1886 , $ 21,000 had been expended in removing the greater part of the obstructions , though the shoals , and here and there a snag , washed in since work was suspended in December , 1882 ...
... shoals also impeded navigation . Up to June 30 , 1886 , $ 21,000 had been expended in removing the greater part of the obstructions , though the shoals , and here and there a snag , washed in since work was suspended in December , 1882 ...
Página 207
... Shoals , Russell Shoals , and Caney Creek Shoals , constructing wing - dams and removing surface obstructions . The total amount expended to June 30 , 1888 , including outstanding liabilities , is $ 2.5,947.70 , which has resulted in ...
... Shoals , Russell Shoals , and Caney Creek Shoals , constructing wing - dams and removing surface obstructions . The total amount expended to June 30 , 1888 , including outstanding liabilities , is $ 2.5,947.70 , which has resulted in ...
Página 418
... shoals are mainly of hard sand and gravel , with some bowlders , all of a kind not easily moved by the current . At the points where these shoals occur the river is too wide to obtain a good channel by the scouring action of the water ...
... shoals are mainly of hard sand and gravel , with some bowlders , all of a kind not easily moved by the current . At the points where these shoals occur the river is too wide to obtain a good channel by the scouring action of the water ...
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels