Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 75
Página 54
The channel of this harbor was obstructed by two reefs , Start Rock and Sheepshead Rock , the former bare at low water , the latter covered to a foot depth or more . The project for improvement adopted in 1876 provided for the removal ...
The channel of this harbor was obstructed by two reefs , Start Rock and Sheepshead Rock , the former bare at low water , the latter covered to a foot depth or more . The project for improvement adopted in 1876 provided for the removal ...
Página 60
In accordance with this plan , Diamond Reef , near Governor's Island , Coenties Reef , off Coenties Slip , Pilgrim Rock , off Nineteenth street , and a reef near the North Brother Island have been cut down , and at Hell Gate 3 acres of ...
In accordance with this plan , Diamond Reef , near Governor's Island , Coenties Reef , off Coenties Slip , Pilgrim Rock , off Nineteenth street , and a reef near the North Brother Island have been cut down , and at Hell Gate 3 acres of ...
Página 573
1 The contract was extended , and in 1883 work was abandoned by the contractor while parts of the rock were still from 1 to 13 feet above the plane of removal . In 1883 Corning Rock was removed to 11 feet depth by hired labor , at a ...
1 The contract was extended , and in 1883 work was abandoned by the contractor while parts of the rock were still from 1 to 13 feet above the plane of removal . In 1883 Corning Rock was removed to 11 feet depth by hired labor , at a ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width