Annual Report of the Secretary of War, Volume 2,Parte 1U.S. Government Printing Office, 1888 |
No interior do livro
Resultados 1-3 de 96
Página i
... HARBOR . Post of Willets Point , School of Application , Battalion of Engineers , 8 ; Experi- ments , Engineer Depot , Public Buildings and Construction , Statement of Funds , 9 . RIVER AND HARBOR IMPROVEMENTS . GENERAL STATEMENT ...
... HARBOR . Post of Willets Point , School of Application , Battalion of Engineers , 8 ; Experi- ments , Engineer Depot , Public Buildings and Construction , Statement of Funds , 9 . RIVER AND HARBOR IMPROVEMENTS . GENERAL STATEMENT ...
Página 3
... river and harbor works .. 4 20 Fortifications , Board of Engineers , post of Willets Point , Engineer School of Ap- plication , and ... harbor works and Missouri River Commission Mississippi River OFFICERS OF THE CORPS OF ENGINEERS.
... river and harbor works .. 4 20 Fortifications , Board of Engineers , post of Willets Point , Engineer School of Ap- plication , and ... harbor works and Missouri River Commission Mississippi River OFFICERS OF THE CORPS OF ENGINEERS.
Página 15
... harbor was made in 1872 , and subsequently two channels , each 80 feet wide and 6 feet deep , were dredged to the upper part of the basin . The present project ... water is expected to stop RIVER AND HARBOR IMPROVEMENTS . 15.
... harbor was made in 1872 , and subsequently two channels , each 80 feet wide and 6 feet deep , were dredged to the upper part of the basin . The present project ... water is expected to stop RIVER AND HARBOR IMPROVEMENTS . 15.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels