Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 86
Página 162
The amount of $ 6,552.62 was expended during the fiscal year ending June 30 , 1888 , and resulted in the preservation of the improvement previously made by contract of 25 miles of the river from Rodgers Fields to Hancocks .
The amount of $ 6,552.62 was expended during the fiscal year ending June 30 , 1888 , and resulted in the preservation of the improvement previously made by contract of 25 miles of the river from Rodgers Fields to Hancocks .
Página 164
The amount expended to June 30 , 1887 , was $ 976.36 , and resulted in making a survey of the bar from Mississippi Sound to Biloxi , for the purpose of locating the proposed channel . The amount expended during the fiscal year ending ...
The amount expended to June 30 , 1887 , was $ 976.36 , and resulted in making a survey of the bar from Mississippi Sound to Biloxi , for the purpose of locating the proposed channel . The amount expended during the fiscal year ending ...
Página 165
The amount expended to June 30 , 1887 , was $ 18,769.40 , and resulted in such improvement of 59 miles of river from Carthage down to Par- tins Bluff , that boats of 3 feet draught of water can navigate this dis- tance on a 4 - foot ...
The amount expended to June 30 , 1887 , was $ 18,769.40 , and resulted in such improvement of 59 miles of river from Carthage down to Par- tins Bluff , that boats of 3 feet draught of water can navigate this dis- tance on a 4 - foot ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width