Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 91
Página 227
Operating and keeping in repair locks and dams on the Kentucky River , Kentucky . ... During the year extensive repairs were made at most of the locks and additional works such as guide - walls , bank pro- tection walls , etc. , built .
Operating and keeping in repair locks and dams on the Kentucky River , Kentucky . ... During the year extensive repairs were made at most of the locks and additional works such as guide - walls , bank pro- tection walls , etc. , built .
Página 273
Only partial repairs to the piers could be made with the small amount of funds available , which repairs were made during the fall of 1886 . At the close of the fiscal year ending June 30 , 1888 , the piers were in fair condition ...
Only partial repairs to the piers could be made with the small amount of funds available , which repairs were made during the fall of 1886 . At the close of the fiscal year ending June 30 , 1888 , the piers were in fair condition ...
Página 449
The western shore of this island is protected by a rubble - stone apron 975 feet long , built in 1873 and repaired and extended in 1884 ; the northern shore is covered by a granite sea - wall 750 feet long , built in 1843 , and the ...
The western shore of this island is protected by a rubble - stone apron 975 feet long , built in 1873 and repaired and extended in 1884 ; the northern shore is covered by a granite sea - wall 750 feet long , built in 1843 , and the ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width