Annual Report of the Secretary of War, Volume 2U.S. Government Printing Office, 1888 |
No interior do livro
Resultados 1-3 de 77
Página 125
... proposed to improve the upper 20 miles by dredging and by jetty contraction of the channel . Two hundred and three thousand two hundred and four dollars and fifty - nine cents were spent during this time in increasing the depth upon the ...
... proposed to improve the upper 20 miles by dredging and by jetty contraction of the channel . Two hundred and three thousand two hundred and four dollars and fifty - nine cents were spent during this time in increasing the depth upon the ...
Página 552
... proposed to substitute for it a riprap jetty at an estimated cost of $ 12,000 ; in 1882 the estimate was changed to $ 20,250 , the contem plated jetty being 6,000 feet long and rising only to low - water level . Such ajetty could ...
... proposed to substitute for it a riprap jetty at an estimated cost of $ 12,000 ; in 1882 the estimate was changed to $ 20,250 , the contem plated jetty being 6,000 feet long and rising only to low - water level . Such ajetty could ...
Página 700
... proposed new pier has been com- pleted and the pile foundation of Pier No. 6 removed , two groups of mooring piles placed between existing piers , and the available deep- water area of the harbor increased to 10 acres by dredging 58,000 ...
... proposed new pier has been com- pleted and the pile foundation of Pier No. 6 removed , two groups of mooring piles placed between existing piers , and the available deep- water area of the harbor increased to 10 acres by dredging 58,000 ...
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels