Página 26
The project proposed contemplates dredging a channel for a draught of 4 feet at mean low water from Proctor's Point to the town wharves , a distance of 3,900 feet , and the removal of a portion of a ledge of rock at Proctor's Point ...
The project proposed contemplates dredging a channel for a draught of 4 feet at mean low water from Proctor's Point to the town wharves , a distance of 3,900 feet , and the removal of a portion of a ledge of rock at Proctor's Point ...
Página 125
The original projects of 1827 to 1847 proposed to improve the upper 20 miles by dredging and by jetty contraction of the channel . Two hundred and three thousand two hundred and four dollars and fifty - nine cents were spent during this ...
The original projects of 1827 to 1847 proposed to improve the upper 20 miles by dredging and by jetty contraction of the channel . Two hundred and three thousand two hundred and four dollars and fifty - nine cents were spent during this ...
Página 552
Appropriations were not made in sufficient amount to warraut be ginning the breakwater as originally designed , and in 1879 Colonel Barlow proposed to substitute for it a riprap jetty at an estimated cost of $ 12,000 ; in 1882 the ...
Appropriations were not made in sufficient amount to warraut be ginning the breakwater as originally designed , and in 1879 Colonel Barlow proposed to substitute for it a riprap jetty at an estimated cost of $ 12,000 ; in 1882 the ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width