Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 65
Página 353
Upon each wire was placed a small sliding block of hard wood 2 inches in diameter at the end towards the ring and much smaller at the outer end , the length of the blocks being 4 inches , and their density about the same as that of ...
Upon each wire was placed a small sliding block of hard wood 2 inches in diameter at the end towards the ring and much smaller at the outer end , the length of the blocks being 4 inches , and their density about the same as that of ...
Página 505
There were 4,258 tons of riprap granite placed in the gap of the main break- water , which carried that portion of the work as far as the funds availa- ble would allow . The timber jetty filled with stone , to form the shore end of the ...
There were 4,258 tons of riprap granite placed in the gap of the main break- water , which carried that portion of the work as far as the funds availa- ble would allow . The timber jetty filled with stone , to form the shore end of the ...
Página 673
During the past fiscal year 2,200 cubic yards of brush - mattress and 18,299 cubic yards of stone have been placed in the work , resulting in the construction to the plane of mean low water of 2,000 linear feet of dike extending ...
During the past fiscal year 2,200 cubic yards of brush - mattress and 18,299 cubic yards of stone have been placed in the work , resulting in the construction to the plane of mean low water of 2,000 linear feet of dike extending ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width