Annual Report of the Secretary of War, Volume 2,Parte 1U.S. Government Printing Office, 1888 |
No interior do livro
Resultados 1-3 de 84
Página 66
... obtaining a channel up to the steam - boat wharf , but shoaling has occurred since the work was done in 1883. The commerce of the town of Babylon , which lies on the creek , is almost entirely moved now by rail , and there appears to be ...
... obtaining a channel up to the steam - boat wharf , but shoaling has occurred since the work was done in 1883. The commerce of the town of Babylon , which lies on the creek , is almost entirely moved now by rail , and there appears to be ...
Página 71
... obtaining by dredging and diking a channel 80 feet wide and 12 feet deep at mean high water from the mouth to Salamander Dock , at an estimated cost of $ 13,800 , increased in 1884 to $ 29,000 . The amount expended under this project to ...
... obtaining by dredging and diking a channel 80 feet wide and 12 feet deep at mean high water from the mouth to Salamander Dock , at an estimated cost of $ 13,800 , increased in 1884 to $ 29,000 . The amount expended under this project to ...
Página 256
... obtain a channel of entrance of navigable width and not less than 12 feet deep . The amount expended to June 30 , 1887 , was $ 252,854.26 , in obtaining a channel 200 feet wide at the entrance and a depth of 10 feet . The amount ...
... obtain a channel of entrance of navigable width and not less than 12 feet deep . The amount expended to June 30 , 1887 , was $ 252,854.26 , in obtaining a channel 200 feet wide at the entrance and a depth of 10 feet . The amount ...
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels