Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 48
Página 66
Seven thousand dollars was applied towards obtaining a channel up to the steam - boat wharf , but shoaling has occurred since the work was done in 1883. The commerce of the town of Babylon , which lies on the creek , is almost entirely ...
Seven thousand dollars was applied towards obtaining a channel up to the steam - boat wharf , but shoaling has occurred since the work was done in 1883. The commerce of the town of Babylon , which lies on the creek , is almost entirely ...
Página 71
The project for improving the creek was adopted in 1878 , and pro- vides for obtaining by dredging and diking a channel 80 feet wide and 12 feet deep at mean high water from the mouth to Salamander Dock , at an estimated cost of ...
The project for improving the creek was adopted in 1878 , and pro- vides for obtaining by dredging and diking a channel 80 feet wide and 12 feet deep at mean high water from the mouth to Salamander Dock , at an estimated cost of ...
Página 256
The amount expended to June 30 , 1887 , was $ 252,854.26 , in obtaining a channel 200 feet wide at the entrance and a depth of 10 feet . The amount expended during the fiscal year ending June 30 , 1888 , including outstanding ...
The amount expended to June 30 , 1887 , was $ 252,854.26 , in obtaining a channel 200 feet wide at the entrance and a depth of 10 feet . The amount expended during the fiscal year ending June 30 , 1888 , including outstanding ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width