Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 85
Página 181
Such improvement can not be permanent , as new obstructions are added from time to time . The first appropriation for this work , by act of 1884 , was applied to removing obstructions in the first 75 miles above the mouth .
Such improvement can not be permanent , as new obstructions are added from time to time . The first appropriation for this work , by act of 1884 , was applied to removing obstructions in the first 75 miles above the mouth .
Página 183
The project for improving this stream was adopted in 1879 , and contemplated building wing dams to scour a channel of from 3 feet to 40 inches over the bar , and the re- moval of snags , sunken logs , and leaning timber obstructing ...
The project for improving this stream was adopted in 1879 , and contemplated building wing dams to scour a channel of from 3 feet to 40 inches over the bar , and the re- moval of snags , sunken logs , and leaning timber obstructing ...
Página 192
boat was employed between the mouth of the Missouri River and Vicks- burg , Miss . , removing obstructions . The boat worked two months and a half , removing 798 snags , cutting down 348 trees , and traveling a dis- tance of 1,792 miles ...
boat was employed between the mouth of the Missouri River and Vicks- burg , Miss . , removing obstructions . The boat worked two months and a half , removing 798 snags , cutting down 348 trees , and traveling a dis- tance of 1,792 miles ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width