Annual Report of the Secretary of War, Volume 2,Parte 1U.S. Government Printing Office, 1888 |
No interior do livro
Resultados 1-3 de 90
Página 112
... object being to excavate a channel through the bar 150 feet wide and 10 feet deep at low water . The amount expended to June 30 , 1888 , is $ 15,500 . The expenditure resulted in securing a channel of 10 feet in depth at low water and ...
... object being to excavate a channel through the bar 150 feet wide and 10 feet deep at low water . The amount expended to June 30 , 1888 , is $ 15,500 . The expenditure resulted in securing a channel of 10 feet in depth at low water and ...
Página 228
... object of building the dam is to form a pool for holding coal boats and barges , with a view to the shipment of coal from the extensive deposits found in the valley . It is expected that other locks and dams will be built if this experi ...
... object of building the dam is to form a pool for holding coal boats and barges , with a view to the shipment of coal from the extensive deposits found in the valley . It is expected that other locks and dams will be built if this experi ...
Página 233
... object the construction of a breakwater northeast of the town to be about 8,000 feet long for the protection of the shipping at the wharves , and to dredge a channel in front of the city wharves sufficient for ves- sels of 16 - feet ...
... object the construction of a breakwater northeast of the town to be about 8,000 feet long for the protection of the shipping at the wharves , and to dredge a channel in front of the city wharves sufficient for ves- sels of 16 - feet ...
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels