Página 112
The present project was adopted in 1879 , the object being to excavate a channel through the bar 150 feet wide and 10 feet deep at low water . The amount expended to June 30 , 1888 , is $ 15,500 . The expenditure resulted in securing a ...
The present project was adopted in 1879 , the object being to excavate a channel through the bar 150 feet wide and 10 feet deep at low water . The amount expended to June 30 , 1888 , is $ 15,500 . The expenditure resulted in securing a ...
Página 228
The object of building the dam is to form a pool for holding coal boats and barges , with a view to the shipment of coal from the extensive deposits found in the valley . It is expected that other locks and dams will be built if this ...
The object of building the dam is to form a pool for holding coal boats and barges , with a view to the shipment of coal from the extensive deposits found in the valley . It is expected that other locks and dams will be built if this ...
Página 233
The project for the improvement of this harbor was adopted in 1887 , and modified in 1888 , and has for its object the construction of a breakwater northeast of the town to be about 8,000 feet long for the protection of the shipping at ...
The project for the improvement of this harbor was adopted in 1887 , and modified in 1888 , and has for its object the construction of a breakwater northeast of the town to be about 8,000 feet long for the protection of the shipping at ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width