Annual Report of the Secretary of War, Volume 2,Parte 1U.S. Government Printing Office, 1888 |
No interior do livro
Resultados 1-3 de 84
Página 89
... navigation , and between Lebanon and Dover navigation was obstructed by overhanging trees . The original project adopted for the improvement provided for a 6- foot low - water navigation by excavating a channel through the bar at the ...
... navigation , and between Lebanon and Dover navigation was obstructed by overhanging trees . The original project adopted for the improvement provided for a 6- foot low - water navigation by excavating a channel through the bar at the ...
Página 118
... navigation ; but its channel was completely blocked at all stages of water by sunken logs and stumps , and by floating obstructions . The original project of 1881 , as continued to date , proposed to secure a safe and unobstructed 3 ...
... navigation ; but its channel was completely blocked at all stages of water by sunken logs and stumps , and by floating obstructions . The original project of 1881 , as continued to date , proposed to secure a safe and unobstructed 3 ...
Página 743
... navigation of the river . The banks of the river between Lebanon and Dover were cleared of overhanging trees during the months of October and November , 1887 . At this date there is a 4 - foot low - water navigation through the en ...
... navigation of the river . The banks of the river between Lebanon and Dover were cleared of overhanging trees during the months of October and November , 1887 . At this date there is a 4 - foot low - water navigation through the en ...
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels