Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 90
Página 71
In its original condition this stream was obstructed at its mouth by a bar having a depth of 9.8 feet on its crest at high water , and by two shoals just inside the mouth . From these shoals a good 12 - foot channel existed to above ...
In its original condition this stream was obstructed at its mouth by a bar having a depth of 9.8 feet on its crest at high water , and by two shoals just inside the mouth . From these shoals a good 12 - foot channel existed to above ...
Página 551
At Derby , 13 miles above its mouth , it receives the discharge of the Naugatuck , a small rapid river . This point , which has been regarded as the head of navigation , is nearly the head of tide - water ; about a mile above there is a ...
At Derby , 13 miles above its mouth , it receives the discharge of the Naugatuck , a small rapid river . This point , which has been regarded as the head of navigation , is nearly the head of tide - water ; about a mile above there is a ...
Página 554
At Stratford , near mouth . At Derby . head of navi- gation . Total . Arrivals and departures of vessels . Tons of cargo received and shipped . Value of cargo received and shipped 575 460 44,301 1,035 69 , 301 $ 3,250 , 600 $ 3,000 ...
At Stratford , near mouth . At Derby . head of navi- gation . Total . Arrivals and departures of vessels . Tons of cargo received and shipped . Value of cargo received and shipped 575 460 44,301 1,035 69 , 301 $ 3,250 , 600 $ 3,000 ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width