Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 78
Página 120
During the fiscal year ending June 30 , 1888 , $ 5,977.22 , including out- standing liabilities , was spent in contracting by jetties about one - half mile of the river between Kinston and New Berne , in removing danger- ous ...
During the fiscal year ending June 30 , 1888 , $ 5,977.22 , including out- standing liabilities , was spent in contracting by jetties about one - half mile of the river between Kinston and New Berne , in removing danger- ous ...
Página 163
... a point 28 miles below and from the mouth of the river to a point 30 miles above , giving a river 58 miles wholly ... fiscal year ending June 30 , 1888 , is $ 4,783.85 , and resulted in the full improvement of 7 miles of river from ...
... a point 28 miles below and from the mouth of the river to a point 30 miles above , giving a river 58 miles wholly ... fiscal year ending June 30 , 1888 , is $ 4,783.85 , and resulted in the full improvement of 7 miles of river from ...
Página 209
The present plan is to obtain a navigable channel 40 feet wide and 2 feet deep at average low water from the mouth of the river to head of navigation , about 33 miles , by reducing the reefs and bars , removing surface obstructions ...
The present plan is to obtain a navigable channel 40 feet wide and 2 feet deep at average low water from the mouth of the river to head of navigation , about 33 miles , by reducing the reefs and bars , removing surface obstructions ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width