The revised project of 1885 is as follows : ( 1 ) To secure a channel not less that 25 feet deep and 500 feet wide at ordinary low water , by dredging from the deep water of Hampton Roads to Norfolk and the United States navy - yard on ...
The revised project of 1885 is as follows : ( 1 ) To secure a channel not less that 25 feet deep and 500 feet wide at ordinary low water , by dredging from the deep water of Hampton Roads to Norfolk and the United States navy - yard on ...
Página 114
The present project was adopted in 1878 , the object being to dredge channels from 100 to 150 feet wide through Windsor Shades , Old Fort , and Binn's bars , to a depth of not less than 8 feet at low water .
The present project was adopted in 1878 , the object being to dredge channels from 100 to 150 feet wide through Windsor Shades , Old Fort , and Binn's bars , to a depth of not less than 8 feet at low water .
Página 416
At Hallowell there are shipped by water from 10,000 to 15,000 tons of granite per year , on which the extra cost of freight due to shoals in less than 3 miles of the river below is given as 15 cents per ton .
At Hallowell there are shipped by water from 10,000 to 15,000 tons of granite per year , on which the extra cost of freight due to shoals in less than 3 miles of the river below is given as 15 cents per ton .
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width