Annual Report of the Secretary of War, Volume 2,Parte 1U.S. Government Printing Office, 1888 |
No interior do livro
Resultados 1-3 de 77
Página 99
... less that 25 feet deep aud 500 feet wide at ordinary low water , by dredging from the deep water of Hampton Roads to Norfolk and the United States navy - yard on the Southern Branch , and also to secure a channel in the Eastern Branch ...
... less that 25 feet deep aud 500 feet wide at ordinary low water , by dredging from the deep water of Hampton Roads to Norfolk and the United States navy - yard on the Southern Branch , and also to secure a channel in the Eastern Branch ...
Página 416
... less than the total capacity , and varies from year to year . In the winter of 1885 - '86 a large part of the best ice - fields were in- jured or ruined by freshets , so that nearly half the companies cut no ice at all , and others cut less ...
... less than the total capacity , and varies from year to year . In the winter of 1885 - '86 a large part of the best ice - fields were in- jured or ruined by freshets , so that nearly half the companies cut no ice at all , and others cut less ...
Página 680
... less than 6 feet of water , or 2 miles if we include all of the shoals covered with less than 12 feet . The width of even the 12 - foot channel between this obstruction and the heads of the Philadelphia Wharves , for 11⁄2 miles , is ...
... less than 6 feet of water , or 2 miles if we include all of the shoals covered with less than 12 feet . The width of even the 12 - foot channel between this obstruction and the heads of the Philadelphia Wharves , for 11⁄2 miles , is ...
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels