On June 30 , 1887 , the south jetty had a total length of 6,667 feet , of which 2,650 feet were built to the level of mean low - water . The north jetty had a total length of 5,603 feet , of which 3,000 feet had its crest at the level ...
On June 30 , 1887 , the south jetty had a total length of 6,667 feet , of which 2,650 feet were built to the level of mean low - water . The north jetty had a total length of 5,603 feet , of which 3,000 feet had its crest at the level ...
Página 297
The plan of the improvement is to open and maintain a channel through the North Spit , and running directly out to sea , just south of Rackliffe Rock , by building a jetty on the south side of the entrance , beginning at a point on the ...
The plan of the improvement is to open and maintain a channel through the North Spit , and running directly out to sea , just south of Rackliffe Rock , by building a jetty on the south side of the entrance , beginning at a point on the ...
Página 534
The channel between the Saybrook jetties , dredged in 1884 , bas shoaled about a foot at either end and has narrowed ... The lengths of the dikes and jetties are as follows : Hartford Dike Glastonbury Dike Saybrook : West jetty .
The channel between the Saybrook jetties , dredged in 1884 , bas shoaled about a foot at either end and has narrowed ... The lengths of the dikes and jetties are as follows : Hartford Dike Glastonbury Dike Saybrook : West jetty .
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width