As a result of this expenditure there had been formed at the latter date a channel of navigable width and 73 feet deep at mean low water through the bars between Bridesburg and Borden- town ; a channel across Five Mile Bar 6 feet deep ...
As a result of this expenditure there had been formed at the latter date a channel of navigable width and 73 feet deep at mean low water through the bars between Bridesburg and Borden- town ; a channel across Five Mile Bar 6 feet deep ...
Página 99
proaches to dredge a channel 500 feet wide and 25 feet deep at ordinary low water through the bars at the Western Branch and Sewell's Point . The revised project of 1885 is as follows : ( 1 ) To secure a channel not less that 25 feet ...
proaches to dredge a channel 500 feet wide and 25 feet deep at ordinary low water through the bars at the Western Branch and Sewell's Point . The revised project of 1885 is as follows : ( 1 ) To secure a channel not less that 25 feet ...
Página 541
For channel 400 feet wide and 20 feet deep For channel 400 feet wide and 18 feet deep For channel 300 feet wide and ... in reply to request from the Chief of Engineers , he estimated $ 10,000 as the cost of widening to 200 feet the 13 ...
For channel 400 feet wide and 20 feet deep For channel 400 feet wide and 18 feet deep For channel 300 feet wide and ... in reply to request from the Chief of Engineers , he estimated $ 10,000 as the cost of widening to 200 feet the 13 ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width