fiscal year ending June 30 , 1888 , is $ 4,952.42 , resulting in increasing the width of the channel from 50 feet to 100 feet at bottom , a distance of 3,050 feet , giving a depth of 6 feet at low water . The 100 - foot channel has been ...
fiscal year ending June 30 , 1888 , is $ 4,952.42 , resulting in increasing the width of the channel from 50 feet to 100 feet at bottom , a distance of 3,050 feet , giving a depth of 6 feet at low water . The 100 - foot channel has been ...
Página 93
The original project for the improvement was to give an 8 - foot low- water navigation 75 feet in width between ... During the fiscal year ending June 30 , 1888 , a channel was excavated 25 feet wide and 8.5 feet deep at low water a ...
The original project for the improvement was to give an 8 - foot low- water navigation 75 feet in width between ... During the fiscal year ending June 30 , 1888 , a channel was excavated 25 feet wide and 8.5 feet deep at low water a ...
Página 109
The present project was adopted in 1881 , and contemplated the excavation of a chanuel through the bars , 100 feet wide and 7 feet deep at low water , from the Potomac River to Atkinson's Upper Landing ( including a channel to ...
The present project was adopted in 1881 , and contemplated the excavation of a chanuel through the bars , 100 feet wide and 7 feet deep at low water , from the Potomac River to Atkinson's Upper Landing ( including a channel to ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width