Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 71
Página 534
The channel between the Saybrook jetties , dredged in 1884 , bas shoaled about a foot at either end and has narrowed ... to building up the jet- ties at Saybrook , and to dredging between them , in accordance with the approved project .
The channel between the Saybrook jetties , dredged in 1884 , bas shoaled about a foot at either end and has narrowed ... to building up the jet- ties at Saybrook , and to dredging between them , in accordance with the approved project .
Página 543
With future appropriations the dike will be completed and the chan- nel dredged through Fort Hale Bar . The estimated cost of this is $ 93,000 ... June 10 , 1872 40,000 Dredging ( 16 feet ) Fort Hale Bar ; removal of rocks . 35,000 Mar.
With future appropriations the dike will be completed and the chan- nel dredged through Fort Hale Bar . The estimated cost of this is $ 93,000 ... June 10 , 1872 40,000 Dredging ( 16 feet ) Fort Hale Bar ; removal of rocks . 35,000 Mar.
Página 557
July 4 , 1836 Dredging outer bar Aug. 30 , 1852 June 23 , 1866 Survey July 11 , 1870 Dredging outer and inner bars .. .do Mar. 3. 1871 Dredging and 521 feet of break water . June 10 , 1872 Mar. 3 , 1873 June 23 , 1874 Mar. 3 , 1875 Aug.
July 4 , 1836 Dredging outer bar Aug. 30 , 1852 June 23 , 1866 Survey July 11 , 1870 Dredging outer and inner bars .. .do Mar. 3. 1871 Dredging and 521 feet of break water . June 10 , 1872 Mar. 3 , 1873 June 23 , 1874 Mar. 3 , 1875 Aug.
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width