Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 74
Página 94
Before any improvement was made the depth of water between Pottsville and Laurel , a distance of 4 miles , varied from 3 feet to one - half foot , and vessels could not reach Laurel . In 1882 a channel was excavated 32 feet wide and 6 ...
Before any improvement was made the depth of water between Pottsville and Laurel , a distance of 4 miles , varied from 3 feet to one - half foot , and vessels could not reach Laurel . In 1882 a channel was excavated 32 feet wide and 6 ...
Página 113
feet deep from Hanovertown to New Castle Ferry , a distance of 9 miles , and 100 feet wide and 7 feet deep at low water on two of the lower bars . The total expenditure to June 30 , 1887 , is $ 6,457.47 , and during the fiscal year ...
feet deep from Hanovertown to New Castle Ferry , a distance of 9 miles , and 100 feet wide and 7 feet deep at low water on two of the lower bars . The total expenditure to June 30 , 1887 , is $ 6,457.47 , and during the fiscal year ...
Página 116
The first project for the improvement of this river was adopted in 1878 , the object being to se- cure a channel 35 feet wide and not less than 24 feet deep at low water between Brevard and Big Buck Shoals , a distance of 31.6 miles .
The first project for the improvement of this river was adopted in 1878 , the object being to se- cure a channel 35 feet wide and not less than 24 feet deep at low water between Brevard and Big Buck Shoals , a distance of 31.6 miles .
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width