Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 71
Página 591
Roah Hook Dike : Piles , 14,495 linear feet , at 13 cents per foot . $ 1,884.33 356.17 310.08 424.50 2,975 , 10 6,878.56 1,212.88 1 , 153.31 1,499 . 18 Total 3. Middle dike at Coeymans : Piles , 53 , 949.5 linear feet , at 124 cents per ...
Roah Hook Dike : Piles , 14,495 linear feet , at 13 cents per foot . $ 1,884.33 356.17 310.08 424.50 2,975 , 10 6,878.56 1,212.88 1 , 153.31 1,499 . 18 Total 3. Middle dike at Coeymans : Piles , 53 , 949.5 linear feet , at 124 cents per ...
Página 659
The entire quantity dredged from between Dikes D and E , as meas- ured in place , is 11,074 cubic yards ... per cubic yard Cost of lifting dredged material over dike , per cubic yard Total cost , per cubic yard 16,815 $ 0.165 .079 .244 ...
The entire quantity dredged from between Dikes D and E , as meas- ured in place , is 11,074 cubic yards ... per cubic yard Cost of lifting dredged material over dike , per cubic yard Total cost , per cubic yard 16,815 $ 0.165 .079 .244 ...
Página 673
The cost of the dike , as estimated by the Board of Engineers of 1884 , was $ 150,000 . The amount already expended in the construction of the dike , together with the amount covered by the existing contract , is about $ 112,000 . 4.
The cost of the dike , as estimated by the Board of Engineers of 1884 , was $ 150,000 . The amount already expended in the construction of the dike , together with the amount covered by the existing contract , is about $ 112,000 . 4.
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width