Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 81
Página 62
The original project of improvement , adopted in 1881 , provided for the removal to a depth of 26 feet at mean low water of such parts of the shoal as came within 850 feet of the Brooklyn wharves , which would take off the crest of the ...
The original project of improvement , adopted in 1881 , provided for the removal to a depth of 26 feet at mean low water of such parts of the shoal as came within 850 feet of the Brooklyn wharves , which would take off the crest of the ...
Página 244
The entrance to this harbor originally varied in depth from absolute closure after storms to about 6 feet . The present project was adopted in 1843 , and contemplated originally a channel 12 feet in depth . The piers have since been ...
The entrance to this harbor originally varied in depth from absolute closure after storms to about 6 feet . The present project was adopted in 1843 , and contemplated originally a channel 12 feet in depth . The piers have since been ...
Página 423
This plane , being that of an exceedingly low run of summer tides , is at least 2 feet below usual low tides , so that any improvement made with it as a datum would ordinarily yield 2 feet more depth than that indicated .
This plane , being that of an exceedingly low run of summer tides , is at least 2 feet below usual low tides , so that any improvement made with it as a datum would ordinarily yield 2 feet more depth than that indicated .
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width