Annual Report of the Secretary of War, Volume 2,Parte 1U.S. Government Printing Office, 1888 |
No interior do livro
Resultados 1-3 de 79
Página 271
... close of the fiscal year with but little progress by the contractor ; 17,036 cubic yards of material were removed from the channel , which restored it to a condi- tion similar to that at close of 1887 . An annual removal of at least ...
... close of the fiscal year with but little progress by the contractor ; 17,036 cubic yards of material were removed from the channel , which restored it to a condi- tion similar to that at close of 1887 . An annual removal of at least ...
Página 272
... close of the fiscal year ending June 30 , 1883 , the sum of $ 21,500 had been appropriated for the present project , of which amount $ 20,871.53 have been expended ; and there was at the close of the season of 1883 a good channel , with ...
... close of the fiscal year ending June 30 , 1883 , the sum of $ 21,500 had been appropriated for the present project , of which amount $ 20,871.53 have been expended ; and there was at the close of the season of 1883 a good channel , with ...
Página 273
... close of the fiscal year ending June 30 , 1888 , the piers were in fair condition ; the depth in channel was about the same as at close of the previous fiscal year . The amount appropriated to close of fiscal year ending June 30 , 1888 ...
... close of the fiscal year ending June 30 , 1888 , the piers were in fair condition ; the depth in channel was about the same as at close of the previous fiscal year . The amount appropriated to close of fiscal year ending June 30 , 1888 ...
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels