Work was commenced in November , 1886 , and was being continued at the close of the fiscal year with but little progress by the contractor ; 17,036 cubic yards of material were removed from the channel , which restored it to a condi- ...
Work was commenced in November , 1886 , and was being continued at the close of the fiscal year with but little progress by the contractor ; 17,036 cubic yards of material were removed from the channel , which restored it to a condi- ...
Página 272
At the close of the fiscal year ending June 30 , 1883 , the sum of $ 21,500 had been appropriated for the present project , of which amount $ 20,871.53 have been expended ; and there was at the close of the season of 1883 a good channel ...
At the close of the fiscal year ending June 30 , 1883 , the sum of $ 21,500 had been appropriated for the present project , of which amount $ 20,871.53 have been expended ; and there was at the close of the season of 1883 a good channel ...
Página 273
At the close of the fiscal year ending June 30 , 1888 , the piers were in fair condition ; the depth in channel was about the same as at close of the previous fiscal year . The amount appropriated to close of fiscal year ending June 30 ...
At the close of the fiscal year ending June 30 , 1888 , the piers were in fair condition ; the depth in channel was about the same as at close of the previous fiscal year . The amount appropriated to close of fiscal year ending June 30 ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width