... canal 8 miles long and for cutting an open channel in the rock - bed of the river over the remaining 4 miles of rapids . The canal was opened in August , 1877 , though not fully completed , and has been in operation since that time ...
... canal 8 miles long and for cutting an open channel in the rock - bed of the river over the remaining 4 miles of rapids . The canal was opened in August , 1877 , though not fully completed , and has been in operation since that time ...
Página 199
... canal to facilitate entrance . The extreme high water of the past spring developed some weak places in the embankment and extensive repair to the same must soon be made . The expenses of the year have been $ 42,802.35 , of which amount ...
... canal to facilitate entrance . The extreme high water of the past spring developed some weak places in the embankment and extensive repair to the same must soon be made . The expenses of the year have been $ 42,802.35 , of which amount ...
Página 218
... Canal . July 1 , 1887 , amount available ... July 1 , 1888 , amount expended during fiscal year , exclusive of liabilities outstanding July 1 , 1887 .. $ 4,896.92 4,896.92 Amount expended during the fiscal year : From appropriation of ...
... Canal . July 1 , 1887 , amount available ... July 1 , 1888 , amount expended during fiscal year , exclusive of liabilities outstanding July 1 , 1887 .. $ 4,896.92 4,896.92 Amount expended during the fiscal year : From appropriation of ...
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels