Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 80
Página 198
The adopted plan provided for the building of a closed canal 8 miles long and for cutting an open channel in the rock - bed of the river over the remaining 4 miles of rapids . The canal was opened in August , 1877 , though not fully ...
The adopted plan provided for the building of a closed canal 8 miles long and for cutting an open channel in the rock - bed of the river over the remaining 4 miles of rapids . The canal was opened in August , 1877 , though not fully ...
Página 199
A floating boom was built and placed this spring at the head of the canal to facilitate entrance . The extreme high water of the past spring developed some weak places in the embankment and extensive repair to the same must soon be made ...
A floating boom was built and placed this spring at the head of the canal to facilitate entrance . The extreme high water of the past spring developed some weak places in the embankment and extensive repair to the same must soon be made ...
Página 658
At the close of the fiscal year $ 5,111.75 was available for this improve- ment ; a survey of the river and canal from Washington to Sayreville was completed in June , 1887 , and reported on in the last annual re- port .
At the close of the fiscal year $ 5,111.75 was available for this improve- ment ; a survey of the river and canal from Washington to Sayreville was completed in June , 1887 , and reported on in the last annual re- port .
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width