Página 284
The present project was adopted in 1870 , and consists of a break- water 5,800 feet in length , parallel to the old west ... It was subsequently modified by the proposed construction of an east breakwater , 2,700 feet in length ...
The present project was adopted in 1870 , and consists of a break- water 5,800 feet in length , parallel to the old west ... It was subsequently modified by the proposed construction of an east breakwater , 2,700 feet in length ...
Página 389
BREAKWATER AT MOUTH OF SACO RIVER , MAINE . The present project for this improvement consists in repairing and completing the old breakwater so that it shall have a height of 15 feet above low water and a width of 12 feet on top .
BREAKWATER AT MOUTH OF SACO RIVER , MAINE . The present project for this improvement consists in repairing and completing the old breakwater so that it shall have a height of 15 feet above low water and a width of 12 feet on top .
Página 546
The first load of stone was delivered April 22 , 1880 , beginning the east breakwater at the end resting upon Southwest Lodge ; under sub- sequent appropriations it has been extended northeasterly , and up to July 1 , 1887 , 2,412 ...
The first load of stone was delivered April 22 , 1880 , beginning the east breakwater at the end resting upon Southwest Lodge ; under sub- sequent appropriations it has been extended northeasterly , and up to July 1 , 1887 , 2,412 ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width