Annual Report of the Secretary of War, Volume 2,Parte 1U.S. Government Printing Office, 1888 |
No interior do livro
Resultados 1-3 de 93
Página 45
... adopted for making the channel 100 feet wide and 14 feet deep at high water ( 11 feet at low water ) by dredging and by building piers . In 1878 a channel 14 feet deep at low water was projected , and in 1882 a modification was adopted ...
... adopted for making the channel 100 feet wide and 14 feet deep at high water ( 11 feet at low water ) by dredging and by building piers . In 1878 a channel 14 feet deep at low water was projected , and in 1882 a modification was adopted ...
Página 74
... adopted in 1881 , and provides for dredging a channel 4 feet deep at mean low water , and 100 feet wide from the mouth to Winkson Creek , and thence 75 feet wide to the rail- road bridge at Mattawan , 250 feet above the freight dock ...
... adopted in 1881 , and provides for dredging a channel 4 feet deep at mean low water , and 100 feet wide from the mouth to Winkson Creek , and thence 75 feet wide to the rail- road bridge at Mattawan , 250 feet above the freight dock ...
Página 282
... adopted in 1829 , proposed to connect the deep waters in the Genesee River with the deep water in the lake by parallel piers about 480 feet apart . The present project , adopted in 1881 , is for the extension of the piers to the 15 ...
... adopted in 1829 , proposed to connect the deep waters in the Genesee River with the deep water in the lake by parallel piers about 480 feet apart . The present project , adopted in 1881 , is for the extension of the piers to the 15 ...
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
POST OF WILLETS POINT ENGINEER SCHOOL OF APPLICATION BAT | 9 |
Officers in charge of divisions 319 | 10 |
70 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
100 feet wide 12 feet deep 1888 Amount available 1890 Submitted 50 feet 9 feet act of August adopted in 1880 amount available July Amount estimated Appendix appropriated by act August 11 available Amount appropriated available for fiscal balance available Amount breakwater Bridge canal commerce completion of existing compliance with requirements construction Corps of Engineers covered by existing Creek cubic yards dike distance dredging dredging a channel ending June 30 entrance estimated cost excavation exclusive of liabilities expended during fiscal expended in fiscal expended to June feet at low feet at mean feet depth feet long fiscal year ending harbor acts House Ex Island jetty Lake liabilities outstanding July mean low water miles mouth obstructions officer in charge original project overhanging trees past fiscal piers Point present project profitably expended proposed repairs required for completion requirements of sections river and harbor rock shoals Submitted in compliance total amount expended vessels