Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 91
Página 45
In 1836 a project was adopted for making the channel 100 feet wide and 14 feet deep at high water ( 11 feet at low water ) by dredging and by building piers . In 1878 a channel 14 feet deep at low water was projected , and in 1882 a ...
In 1836 a project was adopted for making the channel 100 feet wide and 14 feet deep at high water ( 11 feet at low water ) by dredging and by building piers . In 1878 a channel 14 feet deep at low water was projected , and in 1882 a ...
Página 282
The original project for the improve- ment of this harbor , adopted in 1829 , proposed to connect the deep waters in the Genesee River with the deep water in the lake by parallel piers about 480 feet apart .
The original project for the improve- ment of this harbor , adopted in 1829 , proposed to connect the deep waters in the Genesee River with the deep water in the lake by parallel piers about 480 feet apart .
Página 283
The earliest project for the improve- ment of this harbor was adopted in 1829 , and has since been variously modified . The first appropriation was made in 1852. The early proj- ect proposed the partial closing of the opening between ...
The earliest project for the improve- ment of this harbor was adopted in 1829 , and has since been variously modified . The first appropriation was made in 1852. The early proj- ect proposed the partial closing of the opening between ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width