Annual Report of the Secretary of War, Volume 2 |
No interior do livro
Resultados 1-3 de 71
Página 79
The original project under which work was commenced in 1870 pro- posed the formation of a channel 100 feet wide with a depth of 20 feet from the mouth of the river to Gibson's Point , and a depth of 18 feet from thence to Chestnut ...
The original project under which work was commenced in 1870 pro- posed the formation of a channel 100 feet wide with a depth of 20 feet from the mouth of the river to Gibson's Point , and a depth of 18 feet from thence to Chestnut ...
Página 340
Ordnance Officer Post of Wil- lets Point . Under instruction at the Engineer School of Application . On duty under the immediate orders of Major Mansfield . Recorder of Board of Engineer Officers to consider and report upon location and ...
Ordnance Officer Post of Wil- lets Point . Under instruction at the Engineer School of Application . On duty under the immediate orders of Major Mansfield . Recorder of Board of Engineer Officers to consider and report upon location and ...
Página 700
At Gib . son's Point and Point Breeze , which are near each other and closely related as to commercial requirements ... The large interests assembled at these three points cover mainly the commerce of the Schuylkill River , and both the ...
At Gib . son's Point and Point Breeze , which are near each other and closely related as to commercial requirements ... The large interests assembled at these three points cover mainly the commerce of the Schuylkill River , and both the ...
Opinião das pessoas - Escrever uma crítica
Não foram encontradas quaisquer críticas nos locais habituais.
Índice
OFFICERS OF THE CORPS OF ENGINEERS | 3 |
GENERAL DISCUSSION | 9 |
Officers in charge of divisions 319 | 10 |
72 outras secções não apresentadas
Outras edições - Ver tudo
Palavras e frases frequentes
12 feet 1890 Submitted act of August adopted Amount appropriated amount available Amount estimated amount expended Appendix appropriated by act August 11 available for fiscal breakwater Bridge building canal channel close commerce completion of existing compliance with requirements Congress construction continuing contract Creek dams depth dike distance dredging ending June 30 entrance estimated cost examination exclusive of liabilities existing project expended during fiscal expended in fiscal expended to June expenditure feet at low feet at mean feet deep fiscal year ending funds further harbor acts improvement increased Island jetty Lake length liabilities outstanding July locks low-water mean low water miles mouth navigation object obstructions obtaining operations outstanding liabilities placed Point present project profitably expended proposed removal repairs required for completion requirements of sections resulted river and harbor rock shoals snags Submitted in compliance survey tion vessels width