Annual Report of the Secretary of War, Volume 2U.S. Government Printing Office, 1878 |
Outras edições - Ver tudo
Palavras e frases frequentes
00 July act approved June Amount appropriated amount available amount expended annual report Appendix appropriated by act approved June 18 August 14 bank boats bridge canal channel charge Chief of Engineers commenced completion of existing Congress Connecticut River construction contract Corps of Engineers cost cubic yards depth dike distance dredging east base ending June 30 Enfield excavation existing project expended during fiscal expended in fiscal feet at mean feet per second feet wide fiscal year ending foot freshets G. K. WARREN Hartford zero high-water improvement Island ity per second jetties lock Mean in vertical mean low-water Mean velocity miles Mississippi River Missouri River Money statement mouth navigation Observed veloc obstructions pier plane by observed Point port profitably expended proposed removed repairs required for completion riprap rock season shoal slope snags stone survey thousand dollars tide Total velocity of river vertical plane vessels Warehouse Point water above Hartford width